Sign In | Join Free | My adobecards.com |
|
Categories | Stainless Steel Boiler Tube |
---|---|
Brand Name: | YUHONG |
Model Number: | ASME SA213 TP321 |
Certification: | ABS, GL, DNV, NK, PED, AD2000, GOST9941-81, CCS, ISO 9001-2008 |
Place of Origin: | China |
MOQ: | 100 KGS |
Price: | NEGOTIABLE |
Payment Terms: | T/T, L/C |
Supply Ability: | YUHONG HOLDING GROUP CO., LTD |
Delivery Time: | 20-80 days |
Packaging Details: | Ply-wooden Case /Iron Case/ Bundle with plastic Cap |
Standard: | ASTM A213, ASTM A269, ASTM A312 |
Surface Treatment: | Pickled and Annealed |
Category: | Stainless Steel |
European Standard: | 1.4845,1.4539,1.4162 |
Type: | Boiler Tube |
Steel Grade: | TP321, TP304, TP316L |
Section Shape: | Round |
Length: | Customized |
Features: | High Temperature Resistance, Corrosion Resistance, High Pressure Resistance |
Size Length: | Max.: 34m/pc |
Austenitic Steel: | TP347, TP347H,904L |
Company Info. |
YUHONG HOLDING GROUP CO., LTD |
Verified Supplier |
View Contact Details |
Product List |
High-Frequency Welded ASME SA213 TP321 Stainless Steel Seamless Tube | Extreme Heat-Resistant Boiler & Superheater Piping
Yuhong introduces ASME SA213 TP321 Stainless Steel Seamless Tubes, designed for extreme-temperature boiler and superheater systems. These tubes combine titanium-stabilized chromium-nickel alloy durability with superior oxidation resistance, ideal for demanding thermal environments.
Element | Cr | Ni | Ti | C | Mn |
---|---|---|---|---|---|
Composition | 17.0-19.0% | 9.0-12.0% | ≥5×C% | ≤0.08% | ≤2.00% |
Compliant with ASME SA213 and ASTM A213 standards.
Property | Value |
---|---|
Tensile Strength | ≥515 MPa |
Yield Strength | ≥205 MPa |
Elongation (A50) | ≥40% |
Operating Temperature | Up to 900°C (1650°F) |
Q1: What certifications do you provide?
A: ASME, ISO 9001, EN 10216-5, and PED 2014/68/EU.
Q2: Can these tubes withstand thermal cycling?
A: Yes, titanium stabilization prevents carbide precipitation during
repeated heating/cooling.
Q3: What is the lead time for bulk orders?
A: Standard lead time is 4-6 weeks for 20-ft container loads.
Contact Us:
![]() |