Sign In | Join Free | My adobecards.com |
|
Categories | Air Filter Adhesive |
---|---|
Brand Name: | Chang Feng |
Model Number: | Chang Feng |
Certification: | ISO9001 |
Place of Origin: | China, Hebei, |
MOQ: | 5 / Tons |
Price: | Negotiable |
Payment Terms: | L/C, T/T |
Supply Ability: | 20 Ton/Tons per Month PU glue A black and B for heavy duty air filter production |
Delivery Time: | 8-10 work days |
Packaging Details: | mental drum |
Product name:: | Air Filter Adhesive |
component proportion ratio: | 25% |
OEM: | OEM Services Provided |
Main Raw Material: | POLYURETHANE, Polyurethane |
Color: | orange-red and brown-yellow |
Keywords: | Hot Melt Adhesive Products |
Classification: | Double Components Adhesives |
Usage: | Fiber & Garment, Footwear & Leather, Packing, Construction |
Two-component polyurethane adhesive for machine
component proportion ratio is 100:25
Two-component polyurethane adhesive for machine component proportion ratio is 100:25 | ||
Material-A | Material-B | |
Weight | Small barrel :25KG | 6.25KG |
Big barrel :50KG | 12.5KG | |
Physical nature | orange-red viscous liquid (color based on your request to configure) | brown-yellow liquid |
viscosity | 800-1000MPa.S(25°C) | 25-50MPa.S(25°C) |
density | 1.02g/ml | 1.02g/ml |
package | Plastic bucket or Tin bucket | Plastic bucket ,Tin bucket, Plastic pots |
storage | 1. Material-A and material-B can store up 3-6 months. | |
2. To appropriate indoor storage above 15°C |
1. Material-A should stirred evenly with plastic hand electric drill, material-B can shake, before used.
2. Open the electrocaloric plate temperature to 40-50 degrees, in winter material-A and material-B with a small container to preheat.
3. Wipe the mould with release agent
4. Each 1kg A add 3-6g water, also according to the local environment, such as the humidity in the air, workshop environment.
5. material-A and material-B are mixed at the mixture ratio of 100:40 ratio, then add 40% talcum powder(heavy calcium powder)(100:40:50±5), with 2800 rev / min motor to mix, mixing time determined by the amount of adhesive, per 100g of adhesive is approximately 7-10 seconds .
6. Pour the Mixed liquid into mould, then put the paper element and give a little pressure on it. 8-15 minutes later you can bring the mould down.
1.The material must be full rocked after each to the plastic injection machine plastic injection so that the A material mixing evenly.
1.Everytime the plastic injection machine plastic injection A material must be full before the shaking in order to the material until
2.AB material proportioning ratio of A:B=100:25 or 4:1.28°C,you can start operation
3.Material temperature controlled 24°C-28°C appropriate then you can start operation.
4. Must be clean before using the mould release agent (Note:
The new plastic mould can be wiped free)
5 .If A and B is not reaction please measuring A and B ratio.
6. A and B must be sealed to .To avoid the air and water vapor reaction, as a result affecting the effect of colloidal
![]() |